Legend:
Architecture
C&S
M&E
Objectives:
|
||
---|---|---|
Requirements | Supporting Documents | |
Peak Run Off
|
- | |
Roadside Drain Capacity
|
- | |
Sewer Connection
|
- | |
Sewerage System
|
- | |
Drainage Reserve
|
- |
Requirements | Supporting Documents | |
---|---|---|
Pre-Condition CCTV of Sewers (advisable) Can be provided at Piling Gateway (G1.5) or Construction Gateway (G2)
|
- |
Objectives:
|
||
---|---|---|
Requirements | Supporting Documents | |
Public Drains (External)
|
- | |
Public Sewerage System (External)
|
- |
Objectives:
|
||
---|---|---|
Requirements | Supporting Documents | |
|
- | |
|
- | |
|
- |